Assembling Your Pro-Pack II or Pro-Pack II Upgrade Kit

In order to install the new components for the Pro-Pack II or Upgrade Kit, you'll need to first disassemble part of the WE100 so that you can add the Riser and Extended Base Rod. The instructions below walk you through the process. The instructions are also available as a downloadable/printable PDF here: Assembling Your Pro-Pack II.

Step 1)
Remove the Base Rod and Fixed Vise Jaw from the sharpener Base by unscrewing the two Socket Head Cap Screws from underneath the Base Rod using the larger of the hex keys on the Vise Key.

Wicked Edge Knife Sharpener

Step 2)
Holding the Base with the logo facing you, place the Extended Base Rod underneath the Base, so that the engraved lines on the Extended Base Rod are facing up and the detents are facing you. Pass the 1/2” Socket Head Cap Screw through the Extended Base Rod and screw it into the Base. Only the hole on the right side of the Base (when logo is facing you) is threaded to accept the screw.

Wicked Edge Knife Sharpener

Step 3)
Place the Riser on the Base with the hole in the Riser aligned with the through-hole on the left side of the Base. Pass the 2” Socket Head Cap Screw through the Extended Base Rod, Base and Riser and screw it into the bottom of the Fixed Vise Jaw.

Step 4)
Slide the Ball Joint Assemblies onto the Extended Base Rod so that the Ball Joints face in toward the center of the sharpener, as shown in the figure above.

Step 5)
To mount your sharpener to the Mounting Plate, slide the the included washers onto the #10-32 Flat Socket Head Cap screws with the metal side facing the heads of the screws and slide those through the underside of the Mounting Plate. Thread them into the holes on the bottom of the blue sharpener Base and tighten them down with the smaller of the hex keys on the Vise Key. Affix the four adhesive backed rubber bumpers to the underside of the Mounting Plate at each corner.